Skip to content

Roger's Blog

My bike frame build

Primary Navigation

  • Home
  • About
  • Blog
  • Contact

Recent Posts

  • almost finished
  • 1st Test Ride
  • Indexing
  • Final Assembly
  • Back from paint

Archives

  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
August 2025
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Feb    

  • build
  • design
  • final assembly
  • finishing
  • introduction
  • miscellaneous
  • preparation
  • Uncategorised

bikeCAD braze ons brazing build colour component lugs mitre paint RAL Reynolds top eyes tube wheels

Category: final assembly

almost finished
final assembly, finishing

almost finished

80mi of riding and I’m happy with the set up so the bars have been taped. I’ve bought mudguards but … Continue reading almost finished

1st Test Ride
final assembly, finishing

1st Test Ride

First shakedown ride of 8mi. It’s fast, light and twitchy. I still need to settle on bar height and lever … Continue reading 1st Test Ride

Final Assembly
final assembly, finishing

Final Assembly

I made a start on the final build. The headset cups went in nicely but the crown race was very … Continue reading Final Assembly

Back from paint
final assembly

Back from paint

Back from Mikris Finishers. Powder coated in RAL 5024 Pastel Blue and then masked and the RAL 9001 cream was … Continue reading Back from paint

Recent Posts

  • almost finished
  • 1st Test Ride
  • Indexing
  • Final Assembly
  • Back from paint

Archives

  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
August 2025
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Feb    

  • build
  • design
  • final assembly
  • finishing
  • introduction
  • miscellaneous
  • preparation
  • Uncategorised

bikeCAD braze ons brazing build colour component lugs mitre paint RAL Reynolds top eyes tube wheels

Proudly powered by WordPress Theme: Publication by Automattic.